Document Details |
|||||
Name of Department/Committee : | WRD 01 | ||||
---|---|---|---|---|---|
Document Number : | WRD 01 ( 22063) | ||||
Document Title [English] : | Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 1 : General Principles And Requirements | ||||
Document Title [Hindi] : | पूर्णभरेबहाव वालेवृत्ताकार अनुप्रस्थ काट वालेकॉन्डुइट मेंप्रववष्ट दाब ववभेदी युक्तिय ोंद्वारा द्रव प्रवाह का मापन भाग – 1 सामान्य वसद्ाोंत एवों अपेक्षाएों | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 17.120.10 | ||||
Date of Project Approval : | 20-01-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydrometry and equipments |
Sub Sub Group : | Hydrometry & Equipments |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | ISO 5167 -1 : 2022 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | Improved consistency between ISO 5167-1 to ISO 5167-6 (some items that were new in ISO 5167-5 and ISO 5167-6 have been moved to this document) | |
2 | A primary element has been set as part of a differential pressure metering system | |
3 | A short section on diagnostics and CBM (Condition Based Monitoring) has been included | |
4 | A limitation on the use of the 5 % 2° rule for an acceptable profile has been noted | |
5 | Improved text about uncertainty calculation and an example in Annex E has been provided | |
6 | Annexes on turndown and permanent pressure loss have been included |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 20-01-2023 | ------- | ||
2 | P-Draft Waived | 02-03-2023 | Revision of Indian Standard | ------- | |
3 | WC Draft | 02-03-2023 | Duration : 90 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 02-03-2023 | WC rejected by HOD Remarks: Check and resubmit |
------- | |
5 | WC Draft | 02-03-2023 | Duration : 90 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 02-03-2023 | WC approved by HOD |
WRDC WRD 01, | ------- |