Document Details
Name of Department/Committee : WRD 22
Document Number : WRD 22 ( 22124)
Document Title [English] : SAFETY OF BARRAGE AND WEIR STRUCTURES — GUIDELINES (First Revision of IS 12892)
Document Title [Hindi] : बराज और वीयर संरचनाओं की सुरक्षा — दिशानिर्देश (IS 12892 का पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 17-03-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 12892: 1989
2 IS 12892: 1989
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 12892: 1989


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Planning, Design, Construction and Safety of Diversion works, Barrages and related structures
Aspects : Others
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Major changes that have been brought out in this revision are: a) Criteria for fixing waterway has been updated. b) Clause 6.11 has been incorporated for flushing of sediments deposited at upstream using breast walls. c) Clause 7.4.7.2 has been modified because geo-filters of bamboo mattress are not effective in very fine soil. d) Clause 8.7 has been incorporated to take effects of flash floods in operation of barrages/weir which is triggered by cloudburst and glacial lake outburst floods. e) Clause 8.8 has been incorporated for checking efficiency of stilling basin. f) Clause 8.9 has been incorporated for proper operation of gates during operation of barrages/weir.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-03-2023 17-08-2023 01-11-2023 16-03-2024 Mr. Navdeep Yadav 17-03-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 17-03-2023 -------
2 P-Draft Waived 17-03-2023 -------
3 WC Draft 17-03-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 17-03-2023 WC approved by HOD
WRDC  WRD 22, -------