Document Details |
|
Name of Department/Committee : | TED 14 |
---|---|
Document Number : | TED 14 ( 22362) |
Document Title [English] : | SPACE SYSTEMS QUALIFICATION ASSESSMENT |
Document Title [Hindi] : | अंतरिक्ष प्रणाली — योग्यता मूल्यांकन |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 49.140 |
Date of Project Approval : | 27-04-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Transport and Related Products |
Sub Group : | Aircraft equipments and air cargo handing |
Sub Sub Group : | Aircraft accessories & Fittings |
Aspects : | Process Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 15865: 2022 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This draft Indian Standard which identical with ISO 15865: 2022 ‘Space Systems — Qualification Assessment’ | |
2 | This document establishes general rules for qualification assessment of space systems and products used in space systems against their functional and technical specifications. It establishes general requirements for determining system or product readiness for any stage of the life cycle. This includes, for example, readiness for development, manufacture, test, operation, modification, or disposal. This document is applicable to systems and products used in flight or ground support and to products at all levels in a product tree. It applies to systems and products consisting of hardware, software, facilities, materials, methods, processes, procedures or any combination of these. It establishes common: a) general requirements for qualification assessment of item readiness; b) approaches to qualification. This document is intended for use as the basis for a design justification plan. It is intended to be used either in establishing an agreement for such a plan between a customer and |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-04-2023 | ------- | ||
2 | P-Draft Waived | 27-04-2023 | During 26th SC meeting it was decided to wide circulate the document for 60 days. | ------- | |
3 | WC Draft | 27-04-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 23-05-2023 | WC rejected by HOD Remarks: Please make the corrections in the letter |
------- | |
5 | WC Draft | 06-06-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 07-06-2023 | WC approved by HOD |
TEDC TED 14, | ------- |