Document Details |
|
Name of Department/Committee : | TED 14 |
---|---|
Document Number : | TED 14 ( 22366) |
Document Title [English] : | SPACE SYSTEMS PROJECT REVIEWS |
Document Title [Hindi] : | अंतरिक्ष प्रणाली — परियोजना समीक्षा |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 49.140 |
Date of Project Approval : | 27-04-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Transport and Related Products |
Sub Group : | Aircraft equipments and air cargo handing |
Sub Sub Group : | Aircraft accessories & Fittings |
Aspects : | Process Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 21349: 2023 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This draft Indian Standard is identical with ISO 21349: 2023 ‘Space Systems — Project Reviews’ | |
2 | ISO 21349:2007 provides process requirements for project reviews as a set of required functions. The requirements and recommendations cover the function inputs, outputs, mechanisms, and controlling conditions. It is intended for use in implementing the review requirements of ISO 14300-1, ISO 14300-2, ISO 15865, and such other space systems and operations standards that require formal reviews. ISO 21349:2007 specifies the responsibilities of a review board and gives guidance concerning review board composition. ISO 21349:2007 is applicable to reviews for a project at any level within a larger project, as well as for major milestone reviews at the top level of a major project. It is intended to be used either by an independent developer as a basis for enterprise processes, or as a basis for an agreement between a supplier and a customer. ISO 21349:2007 also provides normative descriptions of the kinds of reviews that are commonly useful in assuring the success of a space project. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-04-2023 | ------- | ||
2 | P-Draft Waived | 27-04-2023 | During 26th SC meeting it was decided to wide circulate the document for 60 days. | ------- | |
3 | WC Draft | 27-04-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 23-05-2023 | WC rejected by HOD Remarks: Please make the correction |
------- | |
5 | WC Draft | 06-06-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 08-06-2023 | WC approved by HOD |
TEDC TED 14, | ------- |