Document Details
Name of Department/Committee : ETD 22
Document Number : ETD 22 ( 22394)
Document Title [English] : EXPLOSIVE ATMOSPHERES Part 11: Equipment protection by intrinsic safety i
Document Title [Hindi] : विस्फोटक वातावरण - भाग 11: आंतरिक सुरक्षा "i" द्वारा उपकरण सुरक्षा
Document Type : Revision
Language : English
Priority : 3
ICS Code : 29.260.20
Date of Project Approval : 17-02-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 60079 : PART 11: 2011
Standards to be Superseded :


Classification Details
Group : Equipments for use in Mines and Explosive Atmosphere
Sub Group : Electrical Equipment
Sub Sub Group : Explosive atmosphere d, p, o, e, n, m types
Aspects : Safety Standard
Risk : High
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Coal
  • Ministry of Petroleum and Natural Gas
  • Ministry of Mines
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60079-11:2023
Organization Type: IEC

Sl.No. Synosis Points
1 This part specifies the construction and testing of intrinsically safe apparatus intended for use in explosive atmospheres, and for associated apparatus which is intended for connection to intrinsically safe circuits which enter such atmospheres. This Type of Protection is applicable to electrical equipment in which the electrical circuits themselves are incapable of causing ignition of a surrounding explosive atmosphere. This includes electrical equipment which contains circuits that are intrinsically safe only under certain conditions, for example under battery supply with mains supply removed.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 03-05-2023 03-10-2023 18-12-2023 03-05-2024 Mr. Nitish Kumar Jain 03-05-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 17-02-2023 -------
2 P-Draft Waived 03-05-2023 Approved for WC. -------
3 WC Draft 03-05-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 03-05-2023 WC approved by HOD
ETDC   -------
5 WC Draft 01-01-2024 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 01-01-2024 WC approved by HOD
ETDC   -------