Document Details |
|||||
Name of Department/Committee : | ETD 22 | ||||
---|---|---|---|---|---|
Document Number : | ETD 22 ( 22394) | ||||
Document Title [English] : | EXPLOSIVE ATMOSPHERES Part 11: Equipment protection by intrinsic safety i | ||||
Document Title [Hindi] : | विस्फोटक वातावरण - भाग 11: आंतरिक सुरक्षा "i" द्वारा उपकरण सुरक्षा | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.260.20 | ||||
Date of Project Approval : | 17-02-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Equipments for use in Mines and Explosive Atmosphere |
Sub Group : | Electrical Equipment |
Sub Sub Group : | Explosive atmosphere d, p, o, e, n, m types |
Aspects : | Safety Standard |
Risk : | High |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 60079-11:2023 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part specifies the construction and testing of intrinsically safe apparatus intended for use in explosive atmospheres, and for associated apparatus which is intended for connection to intrinsically safe circuits which enter such atmospheres. This Type of Protection is applicable to electrical equipment in which the electrical circuits themselves are incapable of causing ignition of a surrounding explosive atmosphere. This includes electrical equipment which contains circuits that are intrinsically safe only under certain conditions, for example under battery supply with mains supply removed. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 17-02-2023 | ------- | ||
2 | P-Draft Waived | 03-05-2023 | Approved for WC. | ------- | |
3 | WC Draft | 03-05-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 03-05-2023 | WC approved by HOD |
ETDC | ------- |
5 | WC Draft | 01-01-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 01-01-2024 | WC approved by HOD |
ETDC | ------- |