Document Details |
|||||
Name of Department/Committee : | MTD 10 | ||||
---|---|---|---|---|---|
Document Number : | MTD 10 ( 23428) | ||||
Document Title [English] : | Gold solders for use in manufacture of jewellery specification Third Revision | ||||
Document Title [Hindi] : | आभुषण बनाने में प्रयुक्त स्वर्ण टांके - विशिष्टि (तीसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 39.060 | ||||
Date of Project Approval : | 30-08-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Metals, Alloys and Metal Products (including Steel Products) |
Sub Group : | Precious metals, gems and jewellery |
Sub Sub Group : | Precious Metals |
Aspects : | Product Specification |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | Gold Solders for Use in Manufacture of Jewellery |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Not Equivalent |
Identical/Equivalent Standards : | ISO 22764 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This revision has been brought out to bring the standard in the latest style and format of the Indian Standards. In addition, following significant changes have been made: a) Reference clause has been included; b) Clause 1, ‘Scope’ of the standard has been revised in line with the grades of Gold Jewellery/Artefacts specified in IS 1417:2016 ‘Gold and Gold Alloys, Jewellery/Artefacts-Fineness and Marking-Specification’; c) Clause for Terminology has been inserted after the ‘References’ clause; d) Clause 3, i.e., grades of cadmium free yellow and white gold solder have been revised in line with the revision made in the scope; e) Tables 1 and 2 have been merged into a single table and Table 2 has been deleted; and f) Table 3 has been modified. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 30-08-2023 | ------- | ||
2 | P-Draft Waived | 20-09-2023 | P draft already circulated through mail | ------- | |
3 | WC Draft | 20-09-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 20-09-2023 | WC approved by HOD |
MTDC | ------- |