Document Details
Name of Department/Committee : MTD 10
Document Number : MTD 10 ( 23428)
Document Title [English] : Gold solders for use in manufacture of jewellery specification Third Revision
Document Title [Hindi] : आभुषण बनाने में प्रयुक्त स्वर्ण टांके - विशिष्टि (तीसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 39.060
Date of Project Approval : 30-08-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 3095: 1999
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 3095: 1999


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Precious metals, gems and jewellery
Sub Sub Group : Precious Metals
Aspects : Product Specification
Risk : None
Certification : Not Certifiable
Short Commom Man's Title : Gold Solders for Use in Manufacture of Jewellery
ITCHS Code :
Ministry :
  • Ministry of Mines
Sustainable development Goals :
Degree of Equivalence : Not Equivalent
Identical/Equivalent Standards : ISO 22764
Organization Type: ISO

Sl.No. Synosis Points
1 This revision has been brought out to bring the standard in the latest style and format of the Indian Standards. In addition, following significant changes have been made: a) Reference clause has been included; b) Clause 1, ‘Scope’ of the standard has been revised in line with the grades of Gold Jewellery/Artefacts specified in IS 1417:2016 ‘Gold and Gold Alloys, Jewellery/Artefacts-Fineness and Marking-Specification’; c) Clause for Terminology has been inserted after the ‘References’ clause; d) Clause 3, i.e., grades of cadmium free yellow and white gold solder have been revised in line with the revision made in the scope; e) Tables 1 and 2 have been merged into a single table and Table 2 has been deleted; and f) Table 3 has been modified.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 30-08-2023 30-01-2024 14-04-2024 29-08-2024 SHIV PRAKASH 30-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 30-08-2023 -------
2 P-Draft Waived 20-09-2023 P draft already circulated through mail -------
3 WC Draft 20-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 20-09-2023 WC approved by HOD
MTDC   -------