Document Details
Name of Department/Committee : LITD 11
Document Number : LITD 11 ( 23466)
Document Title [English] : Safety of laser products Part 2: Safety of optical fibre communication systems OFCSs (Superseding IS 14624(Part 2): 2012)
Document Title [Hindi] : लेजर उत्पादों की सुरक्षा भाग 2 ऑप्टिकल फाइबर संचार प्रणालियों (ओएफसीएसएस) की सुरक्षा
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 31.260; 33.180.01
Date of Project Approval : 12-06-2023
Standards to be Revised :
Standards to be Superseded :


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Reliability of Electronic and Electrical items
Aspects : Safety Standard
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
  • Ministry of Communication - Department of Telecommunications
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60825-2:2021
Organization Type: IEC

Sl.No. Synosis Points
1 This document provides requirements and specific guidance for the safe operation and maintenance of optical fibre communication systems (OFCSs). In these systems, optical power is possibly accessible outside the confines of the transmitting equipment and/or at great distance from the optical source. This document requires the assessment of hazard level at each accessible location of the OFCS as a replacement for product classification according to IEC 60825-1. It applies to the installed OFCS as an engineered, end-to-end assembly for the generation, transfer and receipt of optical radiation arising from lasers, light-emitting diodes (LEDs) or optical amplifiers, in which the transference is by means of optical fibre for communication and/or control purposes.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 01-09-2023 01-02-2024 16-04-2024 31-08-2024 SHRI BIPIN JAMBHOLKAR 01-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-06-2023 -------
2 P-Draft Waived 18-09-2023 as IEC Standard is available P-Draft has been waived off -------
3 WC Draft 18-09-2023 Duration : 31 Days
Submitted for HOD approval
-------
4 WC Draft 20-09-2023 WC approved by HOD
LITDC   -------