Document Details |
|
Name of Department/Committee : | LITD 03 |
---|---|
Document Number : | LITD 03 ( 23483) |
Document Title [English] : | Connectors for electronic equipment - Part - 4 Tests and measurements - Section - 1: Voltage stress tests - Test 4a: Voltage proof |
Document Title [Hindi] : | इलेक्ट्रॉनिक उपकरणों के लिए कनेक्टर - भाग - 4 परीक्षण और माप- अनुभाग - 1: वोल्टेज तनाव परीक्षण - परीक्षण 4ए: वोल्टेज प्रूफ |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 31.220.10 |
Date of Project Approval : | 25-08-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Power system control and communication |
Sub Sub Group : | Power System Control and Communications |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IS/IEC 60512-4-1 : 2003 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of IEC 60512, when required by the detail specification, is used for testing connectors of electronic equipment within the scope of IEC technical committee 48. This test may also be used for similar devices when specified in a detail specification. | |
2 | The object of this test is to define a standard test method to determine the ability of a component to withstand specified test voltages applied in a specified manner. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 25-08-2023 | ------- | ||
2 | P-Draft Waived | 04-09-2023 | P-Draft waive | ------- | |
3 | WC Draft | 04-09-2023 | Duration : 60 Days Submitted for HOD approval Remarks : Attached Wc Draft Please provide inputs |
------- | |
4 | WC Draft | 05-09-2023 | WC approved by HOD |
LITDC LITD 03, | ------- |
5 | WC Draft | 22-11-2023 | Duration : 30 Days Submitted for HOD approval Remarks : The committee has been decided to recirculate the WC draft comments for the period of one month |
------- | |
6 | WC Draft | 12-12-2023 | WC approved by HOD |
LITDC LITD 03, | ------- |