Document Details |
|
Name of Department/Committee : | LITD 03 |
---|---|
Document Number : | LITD 03 ( 23487) |
Document Title [English] : | Connectors for electronic equipment Part - 4 Tests and measurements Section - 3: Voltage stress tests - Test 4c: Voltage proof of pre-insulated crimp barrels |
Document Title [Hindi] : | इलेक्ट्रॉनिक उपकरणों के लिए कनेक्टर भाग - 4 परीक्षण और माप अनुभाग - 3: वोल्टेज तनाव परीक्षण - परीक्षण 4सी: प्री-इंसुलेटेड क्रिंप बैरल का वोल्टेज प्रमाण |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | ICS 31.220.10 |
Date of Project Approval : | 25-08-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Power system control and communication |
Sub Sub Group : | Power System Control and Communications |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IS/IEC 60512-4-3 : 2002 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of IEC 60512, when required by the detail specification, is used for testing electromechanical components within the scope of IEC technical committee 48. This test may also be used for similar devices when specified in a detail specification. | |
2 | The object of this test is to detail a standard method to determine the ability of pre-insulated crimp barrels to withstand the crimp operation without damage to the insulation. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 25-08-2023 | ------- | ||
2 | P-Draft Waived | 04-09-2023 | P-Draft waive | ------- | |
3 | WC Draft | 04-09-2023 | Duration : 60 Days Submitted for HOD approval Remarks : Wc Attached Please provide inputs and comments |
------- | |
4 | WC Draft | 05-09-2023 | WC approved by HOD |
LITDC LITD 03, | ------- |
5 | WC Draft | 22-11-2023 | Duration : 30 Days Submitted for HOD approval Remarks : The committee has been decided to recirculate the WC draft comments for the period of one month |
------- | |
6 | WC Draft | 12-12-2023 | WC approved by HOD |
LITDC LITD 03, | ------- |