Document Details
Name of Department/Committee : AYD 07
Document Number : AYD 07 ( 23521)
Document Title [English] : Plastic Containers and Closures for Manufacturing Packaging Dispensing of Homoeopathic Medicine - Specification
Document Title [Hindi] : होम्योपैथिक औषधि के निर्माण, पैकेजिंग और वितरण हेतु प्लास्टिक कंटेनर व क्लोज़र – विशिष्टि
Document Type : New
Language : English
Priority : 2
ICS Code : 55
Date of Project Approval : 17-05-2023
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Plastic Films, Bottles, Jars, Pipes, Sockets and Other Products
Sub Sub Group : HDPE/PP packing material
Aspects : Product Specification
Risk : High
Certification : Voluntary Certification
Short Commom Man's Title : Plastic Containers and Closures for Manufacturing, Packaging & Dispensing of Homoeopathic Medicine -
ITCHS Code :
Ministry :
  • Ministry of AYUSH
Sustainable development Goals :
  • GOOD HEALTH AND WELL BEING
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard prescribes the requirements, methods of sampling and testing of Plastic containers and closures used in Packaging & Dispensing of Homoeopathic Medicines. Provision regarding specifications for plastic Phials, Bottles, Droppers, Stoppers, Caps, and Manufacturing containers are also included.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 05-09-2023 15-01-2024 15-02-2024 15-06-2024 Mr. Kumar Vivekanand 08-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 17-05-2023 -------
2 P-Draft 05-09-2023 Covering letter generated -------
3 P-Draft 05-09-2023 Duration : 15 Days
Remarks : As per the Minutes of the 1st Meeting of AYD 07 P draft prepared by Panel 5 is being circulated to the committee members for a period of two weeks ie up to 20092023
AYD 7, AYD 07, AYD 7 : P5,  -------
4 Skipped to W-Draft 15-11-2023 Stage-Changed -------
5 WC Draft 15-11-2023 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 15-11-2023 WC approved by HOD
AYDC  AYD 07, AYD 01, AYD 02, AYD 03, AYD 04, AYD 05, AYD 06, PCD 12, AYD 7 : P5, AYD 7 : P4, -------