Document Details
Name of Department/Committee : ETD 19
Document Number : ETD 19 ( 23933)
Document Title [English] : INSULATION COORDINATION FOR EQUIPMENT WITHIN LOW-VOLTAGE SYSTEMS Part 4: Consideration of High-Frequency Voltage Stress Second Revision
Document Title [Hindi] : INSULATION COORDINATION FOR EQUIPMENT WITHIN LOW-VOLTAGE SYSTEMS Part 4: Consideration of High-Frequency Voltage Stress ( Second Revision )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 29.080.30
Date of Project Approval : 04-10-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15382 : Part 4: 2017
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15382 : Part 4: 2017


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Electrical installations and general electricals
Sub Sub Group : National Electrical Code
Aspects : Code of Practice
Risk : Medium
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60664-4-2005
Organization Type: IEC

Sl.No. Synosis Points
1 This standard deals with basic, supplementary and reinforced insulation subjected to high-frequency voltage stress within low-voltage equipment. The dimensioning values directly apply for basic insulation; for reinforced insulation additional requirements apply according to Part 1. It is applicable for the dimensioning of clearances, creepage distances and solid insulation stressed by any type of periodic voltages with a fundamental frequency above 30 kHz and up to 10 MHz. It applies to equipment for use up to 2 000 m above sea level having a rated voltage up to a.c. 1 000 V. It specifies the requirements for clearances, creepage distances and solid insulation for equipment based upon their performance criteria. lt includes methods of electric testing with respect to insulation coordination.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 23-10-2023 23-03-2024 07-06-2024 22-10-2024 RITWIK ANAND 23-10-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-10-2023 -------
2 P-Draft Waived 23-10-2023 -------
3 WC Draft 23-10-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 23-10-2023 WC approved by HOD
ETDC  ETD 19, -------