Document Details
Name of Department/Committee : CHD 07
Document Number : CHD 07 ( 23934)
Document Title [English] : ACETIC ACID - CODE OF SAFETY First Revision
Document Title [Hindi] : एसीटिक अम्ल- सुरक्षा संहिता (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 71.080.80;13.300
Date of Project Approval : 29-08-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 5208: 1969
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 5208: 1969


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemicals
Sub Sub Group : Codes of Safety for Hazardous chemicals
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1260 : Part 1: 1973 Pictorial Marking for Handling and Labelling of Goods: Part 1 Dangerous Goods (First Revision)
2 IS 2925: 1984 Specification for industrial safety helmets (Second Revision)
3 IS 4155: 2023 Glossary of Terms Relating to Chemical and Radiation Hazards and Hazardous Chemicals (First Revision)
4 IS 4167: 2020 Glossary of Terms Relating to Air Pollution ( Second Revision )
5 IS 5572: 2009 Classification of hazardous areas (Other Than Mines) having flammable gases and vapours for electrical installation (Third Revision)
6 IS 8519: 1977 Guide for selection of industrial safety equipment for body protection
7 IS 8520: 2023 Eye and face protection — Guidance on selection, use, and maintenance (First Revision)
8 IS 8807: 1978 Guide for selection of industrial safety equipment for protection of arms and hands
9 IS 10592: 2018 Industrial emergency showers, eye and face fountains and combination units - Specification (First Revision)
10 IS 10667: 1983 Guide for selection of industrtal safety equipment for protection of foot and leg

Sl.No. Synosis Points
1 This code describes the properties of acetic acid, the nature of hazards associated with it and the essential information on storage, handling, packing, labelling, and disposal of waste, cleaning and repair of containers, selection and training of personnel, personal protective equipment and first aid. This code does not deal with the specifications for design of buildings, chemical engineering plants, storage vessels and equipment for operations control and waste disposal.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 23-10-2023 23-03-2024 07-06-2024 22-10-2024 Ms. Shubhanjali Umrao 23-10-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-08-2023 -------
2 P-Draft Waived 23-10-2023 -------
3 WC Draft 23-10-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The Committee in its 11th meeting held on 29082023 to issue it into wide circulation for a period of 2 months
-------
4 WC Draft 23-10-2023 WC approved by HOD
CHDC   -------
5 Skipped to Finalization 26-04-2024 Stage-Changed -------
6 Finalization 24-04-2024 The committee in its 13th meeting held on 16042024 decided to finalize the draft and send it for printing after seeking approval from the Chairperson The Chairperson has approved via mail dated 24042024 -------
7 Final Draft 26-04-2024 Submited for HOD approval

Remarks: The committee in its 13th meeting held on 16042024 decided to finalize the draft and send it for printing after seeking approval from the Chairperson The Chairperson has approved via mail dated 24042024
-------
8 Final Draft Rejected by HOD 29-04-2024 Final Draft rejected by HOD
Remarks: Please put up with corrections as discussed.
-------
9 Final Draft 30-04-2024 Submited for HOD approval

Remarks: The corrections have been incorporated
-------
10 Final Draft draft accepted by HOD and sent to Publication 30-04-2024 Final Draft approved by HOD -------
11 Accepted by Publication 03-05-2024 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------