Name of Department/Committee : ETD 19
Document Number : ETD 19 ( 23936)
Document Title [English] : INSULATION CO-ORDINATION Part 2: Application Guidelines Second Revision
Document Title [Hindi] : INSULATION CO-ORDINATION Part 2: Application Guidelines ( Second Revision )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 29.080.30
Date of Project Approval : 04-10-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 60071 : PART 2: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 60071 : PART 2: 2018


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Electrical installations and general electricals
Sub Sub Group : National Electrical Code
Aspects : Code of Practice
Risk : Medium
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60071-2-2023
Organization Type: IEC

Sl.No. Synosis Points
1 This standard constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase AC systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges I and II of IS/IEC 60071-1 and to justify the association of these rated values with the standardized highest voltages for equipment. This association is for insulation co-ordination purposes only. This document covers phase-to-earth, phase-to-phase and longitudinal insulation.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 23-10-2023 23-03-2024 07-06-2024 22-10-2024 RITWIK ANAND 23-10-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-10-2023 -------
2 P-Draft Waived 23-10-2023 -------
3 WC Draft 23-10-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 23-10-2023 WC approved by HOD
ETDC  ETD 19, -------