Document Details
Name of Department/Committee : MTD 11
Document Number : MTD 11 ( 23173)
Document Title [English] : Welding consumables — Covered electrodes for manual metal arc welding of high-strength steels — Classification (Fourth Revision)
Document Title [Hindi] : वेल्डिंग उपभोग्य  उच्च शक्ति वाले स्टील्स के मैनुअल मेटल आर्क वेल्डिंग के लिए कवर किए गए इलेक्ट्रोड - वर्गीकरण (चौथा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 25.160.20
Date of Project Approval : 25-05-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1395: 1982
Standards to be Superseded :


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Welding Electrodes and Accessories
Sub Sub Group : Welding electrodes
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Steel
  • Ministry of Heavy Industries and Public Enterprises
  • Ministry of Micro, Small and Medium Enterprises
  • Ministry of Shipping
  • Ministry of Commerce and Industry - Department of Industrial Policy and Promotion
  • Ministry of Railways
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 18275:2018
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies requirements for classification of covered electrodes and deposited metal in the as-welded condition and in the post-weld heat-treated condition for manual metal arc welding of high-strength steels with a minimum yield strength greater than 500 MPa or a minimum tensile strength greater than 570 MPa. This document is a combined specification providing a classification utilizing a system based on the yield strength and an average impact energy of 47 J of the all-weld metal, or utilizing a system based on the tensile strength and an average impact energy of 27 J of the all-weld metal.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 07-08-2023 07-01-2024 22-03-2024 06-08-2024 Mr. Vishal Kumar Rana 07-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 25-05-2023 -------
2 P-Draft Waived 21-11-2023 Since it is an ISO adoption -------
3 WC Draft 22-11-2023 Duration : 30 Days
Submitted for HOD approval
Remarks : For your kind comments and inputs please
-------
4 WC Draft 22-11-2023 WC approved by HOD
MTDC   -------