Document Details
Name of Department/Committee : MTD 11
Document Number : MTD 11 ( 23214)
Document Title [English] : Welding and allied processes — Determination of hydrogen content in arc weld metal (First Revision)
Document Title [Hindi] : वेल्डिंग और संबद्ध प्रक्रियाएं - आर्क वेल्ड धातु में हाइड्रोजन अंश का निर्धारण (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 25.160.40
Date of Project Approval : 25-05-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11802: 1986
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11802: 1986


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Welding Electrodes and Accessories
Sub Sub Group : Test Methods of welding
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 3690:2018
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies the sampling and analytical procedure for the determination of diffusible hydrogen in martensitic, bainitic, and ferritic steel weld metal arising from the welding of such steels using arc welding processes with filler material. The techniques specified in this document include collection of diffusible hydrogen via displacement of mercury or collection into a headspace filled with an inert gas such as argon. The amount of hydrogen collected is determined by measuring the displaced volume in the former and by, for example, thermal conductivity in the latter. The temperature for collection of diffusible hydrogen is controlled to avoid thermal activation of non-diffusible hydrogen. NOTE  Recommendations and restrictions in regard to older methods of measurement using glycerine are given in Annex B for any comparison work to these older methods.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 09-08-2023 09-01-2024 24-03-2024 08-08-2024 Mr. Vishal Kumar Rana 09-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 25-05-2023 -------
2 P-Draft Waived 11-08-2023 Since, it is an ISO adoption -------
3 WC Draft 11-08-2023 Duration : 30 Days
Submitted for HOD approval
Remarks : For your kind comments and inputs please
-------
4 WC Draft 11-08-2023 WC approved by HOD
MTDC   -------