Document Details |
|||||
| Name of Department/Committee : | WRD 10 | ||||
|---|---|---|---|---|---|
| Document Number : | WRD 10 ( 23313) | ||||
| Document Title [English] : | PROTECTION OF SLOPE FOR RESERVOIR EMBANKMENT CODE OF PRACTICE Second Revision of IS 8237 | ||||
| Document Title [Hindi] : | जलाशय तटबंध के लिए ढलाई का संरक्षण — रीति संहिता (IS 8237 का दूसरा पुनरीक्षण) | ||||
| Document Type : | Revision | ||||
| Language : | English | ||||
| Priority : | 3 | ||||
| ICS Code : | 93.160 | ||||
| Date of Project Approval : | 21-08-2023 | ||||
| Standards to be Revised : |
|
||||
| Standards to be Superseded : |
|
||||
Classification Details |
|
| Group : | Civil Engineering Design and Construction |
| Sub Group : | Hydraulic and other related structures |
| Sub Sub Group : | Reservoirs-Planning, Design, Construction, Operation and maintenance |
| Aspects : | Code of Practice |
| Risk : | None |
| Certification : | Not Certifiable |
| Short Commom Man's Title : | |
| ITCHS Code : | |
| Ministry : |
|
| Sustainable development Goals : | |
| Degree of Equivalence : | Indigenous |
| Identical/Equivalent Standards : | |
| Organization Type: | |
Division Council Chairperson Approval Details |
|||||||||||
|
|||||||||||
::Cross Referenced Indian Standard:: |
|||
| Sl. No. | Is No & Year | IS Title | |
| 1 | IS 4410 : Part 6: 2022 | GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 6 RESERVOIRS | |
| 2 | IS 10635: 2014 | Freeboard requirement in dams - Guidelines (Second Revision) | |
| 3 | IS 9429: 1999 | Drainage system for earth and rockfill dams - Code of practice (First Revision) | |
| Sl.No. | Synosis Points | |
| 1 | The following changes have been made: a) Definition of Minimum Draw Down Level (MDDL) has been updated in reference to IS 4410 (Part 6) : 2022. b) Clause 5.2 has been introduced for choice of suitable stone to be used as riprap. c) Clause 6.1.3 has been modified to include gradation requirement for the coarse filter material with respect to riprap material should conform to IS 9429 : 1999. d) Clause 8.2.2 has been updated to revise criteria for maximum rock size. | |
Timeline Details |
|||||||
|
|
|||||||
|
|||||||
|
|||||||