Document Details
Name of Department/Committee : LITD 06
Document Number : LITD 06 ( 23343)
Document Title [English] : Coaxial communication cables Part 6: Sectional specification for CATV drop cables First Revision
Document Title [Hindi] : समाक्ष संचार केबल भाग 6 सीएटीवी ड्राप केबलों की अनुभागीय विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 33.120.10
Date of Project Approval : 12-06-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61196 : Part 6: 2009
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61196 : Part 6: 2009


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Reliability of Electronic and Electrical items
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Communication - Department of Telecommunications
  • Ministry of Electronics and Information Technology
  • Ministry of Commerce and Industry - Department of Industrial Policy and Promotion
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61196-6:2021
Organization Type: IEC

Sl.No. Synosis Points
1 This part of IEC 61196 applies to coaxial communications cables. It specifies the requirements for CATV drop cables for analogue and digital one and two way signal transmission, e.g. for cable networks for television signals, sound signals, interactive services, surveillance & control systems, and satellite television receiving systems according to the requirements of IEC 60728 1, IEC 60728-1-1, IEC 60728-101, IEC 60728-10, ISO/IEC 11801-1 and ISO/IEC 11801-4.
2 This also includes the transmission of BCT signals provided by a CATV, MATV or SMATV cable network. The operating frequency is from 5 MHz to 1 000 MHz or from 5 MHz to 3 000 MHz. Operating temperature is between −40 °C and +70 °C.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 24-08-2023 24-01-2024 30-06-2024 31-10-2024 SHRI BIPIN JAMBHOLKAR 25-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-06-2023 -------
2 P-Draft Waived 24-08-2023 The committee decided to issue the standard in wide circulation. -------
3 WC Draft 04-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 05-09-2023 WC approved by HOD
LITDC  LITD 11, -------
5 Skipped to Finalization 25-04-2024 Stage-Changed -------
6 Finalization 01-04-2024 ------ -------