Document Details |
|||||
Name of Department/Committee : | LITD 06 | ||||
---|---|---|---|---|---|
Document Number : | LITD 06 ( 23347) | ||||
Document Title [English] : | Passive RF and microwave devices intermodulation level measurement Part 1: General requirements and measuring methods First Revision | ||||
Document Title [Hindi] : | निष्क्रिय आरएफ एवं सुक्ष्म-तरंग उपकरण, इंटरमॉड्यूलेशन स्तर माप भाग 1 सामान्य अपेक्षाएँ और मापन पद्धतियाँ (पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 33.040.20 | ||||
Date of Project Approval : | 12-06-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Components and accessories for telecommunication |
Sub Sub Group : | Cables RF LF TV, radio communications |
Aspects : | Methods of tests |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 62037-1:2021 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of IEC 62037 deals with the general requirements and measuring methods for intermodulation (IM) level measurement of passive RF and microwave components, which can be caused by the presence of two or more transmitting signals. The test procedures given in this document give the general requirements and measurement methods required to characterize the level of unwanted IM signals using two transmitting signals. The IEC 62037 series addresses the measurement of PIM, but does not cover the long-term reliability of a product with reference to its performance. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 12-06-2023 | ------- | ||
2 | P-Draft Waived | 24-08-2023 | The committee decided to issue the standard in wide circulation. | ------- | |
3 | WC Draft | 04-09-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 05-09-2023 | WC approved by HOD |
LITDC | ------- |
5 | Skipped to Finalization | 25-04-2024 | Stage-Changed | ------- | |
6 | Finalization | 01-04-2024 | ------ | ------- |