Document Details
Name of Department/Committee : LITD 06
Document Number : LITD 06 ( 23348)
Document Title [English] : Metallic communication cable test methods Part 4-5: Electromagnetic compatibility EMC Screening or coupling attenuation Absorbing clamp method First Revision
Document Title [Hindi] : धात्विक संचार केबल परीक्षण विधियाँ - भाग 4-5: विद्युत चुम्बकीय संगतता (ईएमसी) - स्क्रीनिंग या युग्मन क्षीणन - क्लैंप विधि को अवशोषित करना (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 33.100.10; 33.120.10
Date of Project Approval : 12-06-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 62153 : Part 4 : Sec 5: 2006
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 62153 : Part 4 : Sec 5: 2006


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Components and accessories for telecommunication
Sub Sub Group : Cables RF LF TV, radio communications
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Communication - Department of Telecommunications
  • Ministry of Electronics and Information Technology
  • Ministry of Commerce and Industry - Department of Industrial Policy and Promotion
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 62153-4-5:2021
Organization Type: IEC

Sl.No. Synosis Points
1 The absorbing clamp method is suitable to determine the screening- or the coupling attenuation of metallic communication cables in the frequency range of 30 MHz to 1 000 MH (2 400 MHz), depending on the performance of the clamp. It is an alternative method to the triaxial method of IEC 62153-4-4 or IEC 62153-4-9. Due to the undefined outer circuit of this absorbing clamp method, the test results obtained at different places and laboratories could vary by at least ± 6 dB.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 24-08-2023 24-01-2024 30-06-2024 30-11-2024 SHRI BIPIN JAMBHOLKAR 25-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-06-2023 -------
2 P-Draft Waived 24-08-2023 The committee decided to issue the standard in wide circulation. -------
3 WC Draft 04-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 05-09-2023 WC approved by HOD
LITDC   -------
5 Skipped to Finalization 25-04-2024 Stage-Changed -------
6 Finalization 01-04-2024 ------ -------