Document Details
Name of Department/Committee : CHD 13
Document Number : CHD 13 ( 24438)
Document Title [English] : Specification for Feed Water Boiler Water and Condensate Water for High Pressure Boilers First Revision
Document Title [Hindi] : उच्च दबाव बॉयलरों के लिए फ़ीड जल, बॉयलर जल और कंडेनसेट जल के लिए विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 27.060.30, 13.060.50
Date of Project Approval : 13-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 10496: 1983
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 10496: 1983


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemicals
Sub Sub Group : Chemical Equipment
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • CLEAN WATER AND SANITATION
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 1.1 This standard prescribes requirements for feed water, boiler water, steam and condensate for water-tube boilers.
2 The requirements prescribed are for boilers operating at pressures above 5.9 MN/m2 (60 kg/cm2) during normal operation of the unit with normal water level in boiler and with nominal output at nominal pressure. Any serious deviation from the above shall be discussed in advance with the boiler manufacturer.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 14-12-2023 14-05-2024 29-07-2024 14-12-2024 Ms. Shubhanjali Umrao 14-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-12-2023 -------
2 P-Draft Waived 14-12-2023 The Water Quality for Industrial Purposes Sectional Committee decided to issue it into wide circulation for period of 2 months -------
3 WC Draft 14-12-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The Water Quality for Industrial Purposes Sectional Committee decided to issue it into wide circulation for period of 2 months
-------
4 WC Draft 14-12-2023 WC approved by HOD