Document Details
Name of Department/Committee : ETD 39
Document Number : ETD 39 ( 24475)
Document Title [English] : Miniature fuses Part 2: Cartridge fuse-links
Document Title [Hindi] : लघु फ़्यूज़ - भाग 2: कार्ट्रिज फ़्यूज़-लिंक
Document Type : Revision
Language : English
Priority : 1
ICS Code : 29.120.50
Date of Project Approval : 23-11-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 60127 : PART 2: 2003
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 60127 : PART 2: 2003


Classification Details
Group : Electrical Appliances and Accessories
Sub Group : Plugs, Sockets, Switches and accessories
Sub Sub Group : Switch plugs, sockets and accessories
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60127-2:2014
Organization Type: IEC

Sl.No. Synosis Points
1 This part of IEC 60127 relates to special requirements applicable to cartridge fuse-links for miniature fuses with dimensions measuring 5 mm × 20 mm and 6,3 mm × 32 mm for the protection of electric appliances, electronic equipment and component parts thereof, normally intended for use indoors. It does not apply to cartridge fuse-links for appliances intended to be used under special conditions, such as in corrosive or explosive atmospheres. This standard applies in addition to the requirements of IEC 60127-1. The object of this standard is to define special and additional test methods for cartridge fuse- links applying in addition to the requirements of IEC 60127-1.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-12-2023 22-03-2024 22-04-2024 22-06-2024 SHRI SURESH KUMAR GOPALAN 22-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 23-11-2023 -------
2 P-Draft Waived 22-12-2023 -------
3 WC Draft 22-12-2023 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 22-12-2023 WC approved by HOD
ETDC   -------