Document Details
Name of Department/Committee : ETD 39
Document Number : ETD 39 ( 24478)
Document Title [English] : Miniature Fuses Part 6: Fuse-Holders for Miniature Fuse-Links
Document Title [Hindi] : लघु फ़्यूज़ - भाग 6: लघु फ़्यूज़-लिंक के लिए फ़्यूज़-धारक
Document Type : Revision
Language : English
Priority : 1
ICS Code : 29.120.50
Date of Project Approval : 23-11-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 127 : PART 6: 1994
Standards to be Superseded :


Classification Details
Group : Electrical Appliances and Accessories
Sub Group : Plugs, Sockets, Switches and accessories
Sub Sub Group : Switch plugs, sockets and accessories
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60127-6:2023
Organization Type: IEC

Sl.No. Synosis Points
1 This document is applicable to fuse-holders for miniature cartridge fuse-links according to IEC 60127-2, sub-miniature fuse-links according to IEC 60127-3, universal modular fuse- links to IEC 60127-4 and miniature fuse-links for special applications to IEC 60127-7 for the protection of electric appliances, electronic equipment and component parts thereof, normally intended for use indoors. It does not apply to fuse holders for fuses completely covered by the subsequent parts of IEC 60269-1. This document applies to fuse-holders with: – a maximum rated current of 25 A and – a maximum rated voltage of 1 500 V DC or 1 000 V AC; and – for use up to 2 000 m above sea-level, unless otherwise specified. The object of this document is to establish uniform requirements for safety and the assessment of electrical, mechanical, thermal and climatic properties of fuse-holders and the compatibility between fuse-holders and fuse-links.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-12-2023 22-03-2024 22-04-2024 22-06-2024 SHRI SURESH KUMAR GOPALAN 22-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 23-11-2023 -------
2 P-Draft Waived 22-12-2023 -------
3 WC Draft 22-12-2023 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 22-12-2023 WC approved by HOD
ETDC   -------