Document Details
Name of Department/Committee : TED 02
Document Number : TED 02 ( 24510)
Document Title [English] : INTERNAL COMBUSTION ENGINES - PISTON RINGS - PART 3: COIL-SPRING-LOADED OIL CONTROL RINGS MADE OF STEEL
Document Title [Hindi] : आंतरिक दहन इंजन — पिस्टन रिंग — भाग 3: स्टील से बने कॉइल-स्प्रिंग-लोडेड तेल नियंत्रण रिंग
Document Type : New
Language : English
Priority : 3
ICS Code : 43.060.10
Date of Project Approval : 27-12-2023
Standards to be Superseded :


Classification Details
Group : Transport and Related Products
Sub Group : Automobiles and their components
Sub Sub Group : IC Engine Components
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Road Transport and Highways
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 6626-3:2019
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies the essential dimensions of coil-spring-loaded oil control rings made of steel, of piston ring types SOR (with R-shaped groove) and SOV (with V-shaped groove). This document applies to coil-spring-loaded oil control rings made of steel with a diameter from 60 mm up to and including 160 mm for reciprocating internal combustion engines. It can also be used for piston rings in compressors working under analogous conditions.
2 The common features and dimensional tables presented in this document constitute a broad range of variables and, in selecting a particular ring type, the designer will bear in mind the conditions under which it will be required to operate.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 27-12-2023 27-05-2024 11-08-2024 26-12-2024 Mr. Gaurav Jayaswal 27-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-12-2023 -------
2 P-Draft Waived 27-12-2023 -------
3 WC Draft 29-12-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 29-12-2023 WC approved by HOD
TEDC   -------