Document Details |
|
Name of Department/Committee : | ETD 54 |
---|---|
Document Number : | ETD 54 ( 24541) |
Document Title [English] : | Marine energy Wave tidal and other water current converters Part 1: Vocabulary |
Document Title [Hindi] : | समुद्री ऊर्जा - तरंग, ज्वार और अन्य जल धारा परिवर्तक भाग 1: शब्दावली |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 27.140 |
Date of Project Approval : | 02-01-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Renewable energy devices |
Sub Sub Group : | Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove |
Aspects : | Terminology |
Risk : | Medium |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 62600-1: 2020 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This standard defines the terms relevant to marine energy. For the purposes of this document, sources of ocean and marine renewable energy are taken to include primarily devices that convert wave, tidal and other water current energy into electrical energy, although other conversion methods, systems and products are included. Terms relating to conventional dam and tidal barrage, offshore wind, marine biomass, and salinity gradient energy conversion are not included in the scope of this document. This document is intended to provide uniform terminology to facilitate communication between organizations and individuals in the marine energy industry and those who interact with them |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 02-01-2024 | ------- | ||
2 | P-Draft Waived | 02-01-2024 | ------- | ||
3 | WC Draft | 02-01-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 02-01-2024 | WC approved by HOD |
ETDC ETD 54, | ------- |