Document Details
Name of Department/Committee : ETD 54
Document Number : ETD 54 ( 24543)
Document Title [English] : Marine Energy wave tidal and other water current converters Part 10 : Assessment of mooring system for marine energy converters MECS
Document Title [Hindi] : समुद्री ऊर्जा - तरंग, ज्वार और अन्य जल धारा परिवर्तक भाग 10: समुद्री ऊर्जा परिवर्तक (एमईसीएस) के लिए मूरिंग प्रणाली का आकलन
Document Type : New
Language : English
Priority : 3
ICS Code : 27.140
Date of Project Approval : 02-01-2024
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove
Aspects : Code of Practice
Risk : Medium
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Earth Sciences
Sustainable development Goals :
  • CLIMATE ACTION
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 62600-10-2021
Organization Type: IEC

Sl.No. Synosis Points
1 The purpose of this standard is to provide uniform methodologies for the design and assessment of mooring systems for floating Marine Energy Converters (MECs) (as defined in the TC 114 scope). It is intended to be applied at various stages, from mooring system assessment to design, installation and maintenance of floating Marine Energy Converters plants. This standard is applicable to mooring systems for floating Marine Energy Converters units of any size or type in any open water conditions. Some aspects of the mooring system design process are more detailed in existing and well-established mooring standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 02-01-2024 02-06-2024 17-08-2024 01-01-2025 RITWIK ANAND 02-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 02-01-2024 -------
2 P-Draft Waived 02-01-2024 -------
3 WC Draft 02-01-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 02-01-2024 WC approved by HOD
ETDC  ETD 54, -------