Document Details
Name of Department/Committee : ETD 54
Document Number : ETD 54 ( 24544)
Document Title [English] : Marine Energy wave tidal and other water current converters Part 20 : Design and Analysis of an Ocean Thermal Energy Conversion OTEC plant General Guidance
Document Title [Hindi] : समुद्री ऊर्जा - तरंग, ज्वार और अन्य जल धारा परिवर्तक भाग 20: महासागर तापीय ऊर्जा रूपांतरण (ओटीईसी) संयंत्र का डिजाइन और विश्लेषण - सामान्य मार्गदर्शन
Document Type : New
Language : English
Priority : 3
ICS Code : 27.140
Date of Project Approval : 02-01-2024
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove
Aspects : Dimensions
Risk : Medium
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Earth Sciences
Sustainable development Goals :
  • CLIMATE ACTION
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 62600-20-2019
Organization Type: IEC

Sl.No. Synosis Points
1 This standard general principles for design assessment of OTEC plants. The goal is to describe the design and assessment requirements of OTEC plants used for stable power generation under various conditions. This electricity may be used for utility supply or production of other energy carriers. The intended audience is developers, engineers, bankers, venture capitalists, entrepreneurs, finance authorities and regulators. This standard is applicable to land-based (i.e. onshore), shelf-mounted (i.e. nearshore seabed mounted) and floating OTEC systems. For land-based systems the scope of this document ends at the main power export cable suitable for connection to the grid. For shelf mounted and floating systems, the scope of this document normally ends at the main power export cable where it connects to the electrical grid.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 02-01-2024 02-06-2024 17-08-2024 01-01-2025 RITWIK ANAND 02-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 02-01-2024 -------
2 P-Draft Waived 02-01-2024 -------
3 WC Draft 02-01-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 02-01-2024 WC approved by HOD
ETDC  ETD 54, -------