Document Details
Name of Department/Committee : CHD 21
Document Number : CHD 21 ( 24561)
Document Title [English] : CHLORINATED RUBBER FOR PAINTS - SPECIFICATION First Revision
Document Title [Hindi] : पेंट के लिए क्लोरीनयुक्त रबर - विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 87.060.10
Date of Project Approval : 04-01-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13467: 1992
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13467: 1992


Classification Details
Group : Building Materials including Paints
Sub Group : Pigments, Paints and Accessories
Sub Sub Group : Raw Material for paints and test methods
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard was originally published in 1992. This revision has been taken to bring out the standard in the latest style and format of the Indian Standard. In addition, the following changes have been made: a) The U-tube viscometer test method has been replaced with the Brookfield viscometer due to its inefficiency and time-consuming. Similarly, the bomb calorimetry method has been replaced by the combustion method, due to outdated methodology of bomb calorimetry. b) To address health and safety concerns, restrictions for lead has been tightened and restriction for toxic heavy metals has been introduced; c) A suitable precautionary note has been added in the marking clause in order to prevent unforeseen events, and; d) Additionally, the various editorial corrections, and references have been updated to ensure accuracy and relevance in the revised standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-01-2024 04-05-2024 04-06-2024 04-10-2024 Mr. Pushpendra Kumar 04-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-01-2024 -------
2 P-Draft Waived 04-01-2024 -------
3 WC Draft 04-01-2024 Duration : 62 Days
Submitted for HOD approval
Remarks : The Sectional Committee CHD 21 in its 14th meeting had decided to send the document for wide circulation for a period of 60 days Kindly approve
-------
4 WC Draft 09-01-2024 WC approved by HOD
CHDC  CHD 20, -------