Document Details |
|||||
Name of Department/Committee : | WRD 09 | ||||
---|---|---|---|---|---|
Document Number : | WRD 09 ( 24572) | ||||
Document Title [English] : | RECOMMENDATIONS FOR LIGHTING VENTILATION AND OTHER FACILITIES INSIDE DAMS | ||||
Document Title [Hindi] : | बांधों के भीतर प्रकाश, संवातन एवं अन्य सुविधाओं के लिए अनुशंसाए | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 27-10-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Design, Construction, Planning related to Dams |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard lays the guidelines for the provision of various facilities such as lighting, ventilation, water supply, etc. inside dams to achieve maximum productivity coupled with a high standard of safety and welfare. Proper lighting inside dams is essential for creating a good visual environment and for permitting a high degree of efficiency in seeing whatever equipment/machinery is of special importance. Lighting is considered good when it is suitable both in quality and quantity. | |
2 | To cater to the requirement of fresh air inside the dam galleries which are not normally connected to the outside atmosphere, the provision of a good ventilation system to ensure the required number of air changes is essential. The other facilities recommended in this standard for provision inside dams include water supply, compressed air supply, drainage system, firefighting system, communication system, elevators, entrance doors, and first-aid. The first revision of the standard has been taken after the wide field experience and international practices updating the references. The provision of LED lamps has been recommended for more efficient lighting and the provision of galvanized iron pipeline for drinking water supply has been deleted. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-10-2023 | ------- | ||
2 | P-Draft Waived | 05-01-2024 | Sectional Committee decided in its 22nd meeting | ------- | |
3 | WC Draft | 05-01-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 08-01-2024 | WC approved by HOD |
WRDC | ------- |