Document Details
Name of Department/Committee : TED 02
Document Number : TED 02 ( 24621)
Document Title [English] : Internal Combustion Engines - Piston Rings - Oil Control Rings
Document Title [Hindi] : आंतरिक दहन इंजन — पिस्टन रिंग — तेल नियंत्रण रिंग
Document Type : Revision
Language : English
Priority : 3
ICS Code : 43.060.10
Date of Project Approval : 10-01-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 8422 : Part 6: 1977
2 IS 8422 : Part 7: 1977
3 IS 8422 : Part 8: 1977
Standards to be Superseded :


Classification Details
Group : Transport and Related Products
Sub Group : Automobiles and their components
Sub Sub Group : Automotive vehicles, chassis, body fittings and passive safety
Aspects : Product Specification
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Consumer Affairs
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 6625
Organization Type: ISO

Sl.No. Synosis Points
1 This International Standard specifies the essential dimensional features of S-, G-, D- and DV-oil control piston ring types. The normal range for the axial width of oil control rings (2,5 to 8 mm inclusive) is divided into 0,5 or 1,0 mm increments. In table 7, dimensions in inch units are given for oil control rings with axial width 4,75 mm (equal to 3/16 in) for existing applications. The requirements of this International Standard apply to oil control rings for reciprocating internal combustion piston engines, up to and including 200 mm diameter. It may also be used for piston rings of compressors working under similar conditions.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 10-01-2024 10-06-2024 25-08-2024 09-01-2025 Mr. Gaurav Jayaswal 10-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 10-01-2024 -------
2 P-Draft Waived 11-01-2024 -------
3 WC Draft 11-01-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 11-01-2024 WC approved by HOD
TEDC   -------