Document Details |
|
Name of Department/Committee : | MED 07 |
---|---|
Document Number : | MED 07 ( 24665) |
Document Title [English] : | EARTH-MOVING MACHINERY OPERATOR ENCLOSURE ENVIRONMENT PART 1 TERMS AND DEFINITIONS (Adoption of ISO 10263-1) |
Document Title [Hindi] : | भू-संचलन मशीनरी — संचालन आवेष्टन वातावरण — भाग 1 पारिभाषिक शब्दावली ( ISO 10263-1 का अधिग्रहण ) |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 53.100 |
Date of Project Approval : | 27-06-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Earth-Moving Machinery |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 10263-1 : 2009 |
Organization Type: | ISO |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS/ISO 6165: 2012 | Earth - Moving machinery - Basic types - Identification and terms and definitions | |
2 | IS 11113: 1999 | Earth-moving machinery, and tractors and machinery for agriculture and forestry - Seat index point (second revision) |
Sl.No. | Synosis Points | |
1 | ISO 10263 provides test methods and criteria for the evaluation of the operator enclosure environment in earth-moving machinery as defined in ISO 6165. This part of ISO 10263 gives the terms and definitions which are used in other parts of ISO 10263. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 27-06-2023 | ------- | ||
2 | P-Draft Waived | 17-01-2024 | The committee decided to Wide circulate the draft standard. | ------- | |
3 | WC Draft | 17-01-2024 | Duration : 45 Days Submitted for HOD approval Remarks : The committee decided to wc the draft document for comments |
------- | |
4 | WC Draft | 25-01-2024 | WC rejected by HOD Remarks: Please discuss along with the hard copy of the document. |
------- | |
5 | WC Draft | 07-03-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 08-03-2024 | WC rejected by HOD Remarks: Please Check. |
------- | |
7 | WC Draft | 20-03-2024 | WC approved by HOD |
MEDC MED 07, | ------- |
8 | Skipped to Finalization | 06-01-2025 | Stage-Changed | ------- | |
9 | Finalization | 20-12-2024 | The committee finalize the document for publication stage | ------- | |
10 | Final Draft | 06-01-2025 | Submited for HOD approval |
------- | |
11 | Final Draft draft accepted by HOD and sent to Publication | 07-01-2025 | Final Draft approved by HOD | ------- | |
12 | Accepted by Publication | 08-01-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
13 | Skipped to Pdf Stage | 16-01-2025 | Proof to Technial Department Stage-Skipped | ------- | |
14 | Pdf sent by Publication to Technical Department | 16-01-2025 | 1. Please find enclosed the PDF attached. 2. Department to take following actions: A. Provide DC approval in the relevant tab of the portal. B. Confirm the correctness of the document. C. Give recommendation for proceeding to gazette details. | ------- |