Document Details
Name of Department/Committee : MHD 15
Document Number : MHD 15 ( 24688)
Document Title [English] : Medical Electrical Equipment Part 2 Particular Requirements for the Basic Safety and Essential Performance Section 33 Magnetic resonance equipment for medical diagnosis IEC 60601-2-33: 2022 MOD First Revision
Document Title [Hindi] : चिकित्सा विद्युत् उपकरण भाग 2 बुनियादी सुरक्षा और आवश्यक प्रदर्शन के लिए विशेष आवश्यकताएं अनुभाग 33 चिकित्सा निदान के लिए चुंबकीय अनुनाद उपकरण (IEC 60601-2-33: 2022, संशोधित) (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 11.040.55
Date of Project Approval : 18-01-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13450 : Part 2 : Sec 33: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13450 : Part 2 : Sec 33: 2018


Classification Details
Group : Medical and Hospital Equipments
Sub Group : Diagnostic Instruments
Sub Sub Group : Imaging and Radiotherapy equipment
Aspects : Product Specification
Risk : High
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Health and Family Welfare
Sustainable development Goals :
Degree of Equivalence : Modified/Technically Equivalent
Identical/Equivalent Standards : IEC 60601-2-33: 2022
Organization Type: IEC

Sl.No. Synosis Points
1 This document applies to the BASIC SAFETY and ESSENTIAL PERFORMANCE of MAGNETIC RESONANCE (MR) EQUIPMENT and MAGNETIC RESONANCE (MR) SYSTEMS.
2 If a clause or subclause is specifically intended to be applicable to MR EQUIPMENT only, or to MR SYSTEMS only, the title and content of that clause or subclause will say so. If that is not the case, the clause or subclause applies both to MR EQUIPMENT and to MR SYSTEMS, as relevant.
3 This document does not formulate additional specific requirements for MR EQUIPMENT or MR SYSTEMS used in INTERVENTIONAL MR EXAMINATIONS.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-01-2024 18-06-2024 02-09-2024 17-01-2025 Ms. Gurpreet Kaur Bhombra 18-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-01-2024 -------
2 P-Draft Waived 18-01-2024 IEC Adoption -------
3 WC Draft 18-01-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 19-01-2024 WC rejected by HOD
Remarks: reject
-------
5 WC Draft 24-01-2024 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 24-01-2024 WC approved by HOD
MHDC  MHD 15, -------