Document Details
Name of Department/Committee : ETD 43
Document Number : ETD 43 ( 24708)
Document Title [English] : Determination of certain substances in electrotechnical products Part 3-3: Screening Polybrominated biphenyls polybrominated diphenyl ethers and phthalates in polymers by gas chromatography-mass spectrometry using a pyrolyserthermal desorption accessory PyTDGCMS
Document Title [Hindi] : इलेक्ट्रोटेक्निकल उत्पादों में कुछ पदार्थों का निर्धारण - भाग 3-3: स्क्रीनिंग - पॉलीब्रोमिनेटेड बाइफिनाइल, पॉलीब्रोमिनेटेड डिपेनिल ईथर और पॉलिमर में गैस क्रोमैटोग्राफी-मास स्पेक्ट्रोमेट्री द्वारा पाइरोलाइजर/थर्मल डिसोर्प्शन एक्सेसरी (पीवाई/टीडी-जीसी-एमएस) का उपयोग करके फ़ेथलेट्स।
Document Type : New
Language : English
Priority : 3
ICS Code : 13.020.01; 43.040.10
Date of Project Approval : 10-11-2023
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemicals
Sub Sub Group : Methods of test for chemical compunds & heavy metals
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 62321-3-3: 2021
Organization Type: IEC

Sl.No. Synosis Points
1 Provide a test method that will allow the electrotechnical industry to determine the levels of polybrominated biphenyls (PBBs), polybrominated diphenyl ethers (PBDEs), di-isobutyl phthalate (DIBP), di-n-butyl phthalate (DBP), benzylbutyl phthalate (BBP), di-(2-ethylhexyl) phthalate (DEHP), di-n-octyl phthalate (DNOP), di-isononyl phthalate (DINP) and di-isodecyl phthalate (DIDP) in electrotechnical products on a consistent global basis.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 24-01-2024 24-06-2024 08-09-2024 23-01-2025 Mr. Nitish Kumar Jain 24-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 10-11-2023 -------
2 P-Draft Waived 24-01-2024 -------
3 WC Draft 24-01-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 24-01-2024 WC approved by HOD
ETDC   -------