Document Details
Name of Department/Committee : CED 05
Document Number : CED 05 ( 24822)
Document Title [English] : Precast Concrete Paving Flags Specification
Document Title [Hindi] : प्रीकास्ट कंक्रीट पेविंग फ्लैग — विशिष्टि
Document Type : New
Language : English
Priority : 3
ICS Code : 93.080.20
Date of Project Approval : 09-02-2024
Standards to be Superseded :


Classification Details
Group : Building Materials including Paints
Sub Group : Flooring, Roofing and Wall Finishing Products
Sub Sub Group : Flooring and Roofing Standards
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title : PAVING FLAG
ITCHS Code :
Ministry :
  • Ministry of Road Transport and Highways
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Concrete Block Pavement (CBP)’ or non-interlocking CBP consists of a surface layer of small-element, solid un-reinforced pre-cast concrete paver blocks laid on a thin, compacted bedding material which is constructed over a properly profiled base course and is bounded by edge restraints/kerb stones, The block joints are filled using suitable fine material. These are also known as precast concrete paving flags.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 09-02-2024 09-07-2024 24-09-2024 08-02-2025 ABHISHEK PAL 09-02-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 09-02-2024 -------
2 P-Draft Waived 09-02-2024 The Committee approved the draft for wide circulation -------
3 WC Draft 09-02-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 10-02-2024 WC rejected by HOD
Remarks: corrections as discussed to make the draft further w.r.t IS 12 be kindly incorporated
-------
5 WC Draft 10-02-2024 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 10-02-2024 WC approved by HOD
CEDC  CED 53, -------