Document Details |
|
Name of Department/Committee : | PGD 13 |
---|---|
Document Number : | PGD 13 ( 24935) |
Document Title [English] : | Mechanical Vibration Vibration of Rotating Machinery Equipped with Active Magnetic Bearings Part 2 Evaluation of Vibration |
Document Title [Hindi] : | यांत्रिक कंपन — सक्रिय चुंबकीय बियरिंग्स वाली घूर्णन मशीनरी का कंपन — भाग 2 कंपन का मूल्यांकन |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 17.160 |
Date of Project Approval : | 22-02-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Transmission equipments and bearings |
Sub Sub Group : | Bearings and its components, (Types & Rating) |
Aspects : | Methods of tests |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 14839-2:2004 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This standard sets out general guidelines for measuring and evaluating rotating machinery equipped with active magnetic bearings (AMBs) with respect to the following two indices: — shaft vibratory displacement measured at or close to the AMBs, and — working current and voltage measured in magnetic coils or power supply amplifiers. Both indices are measured under nominal operating conditions in house and/or on site. These guidelines are presented in terms of both steady-state running values of these indices and any magnitude changes which may occur in these steady-state operations. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-02-2024 | ------- | ||
2 | P-Draft Waived | 22-02-2024 | ------- | ||
3 | WC Draft | 22-02-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 28-02-2024 | WC approved by HOD |
PGDC | ------- |