Document Details |
|
Name of Department/Committee : | PGD 13 |
---|---|
Document Number : | PGD 13 ( 24938) |
Document Title [English] : | Mechanical Vibration Vibration of Rotating Machinery Equipped with Active Magnetic Bearings Part 3 Evaluation of Stability Margin |
Document Title [Hindi] : | यांत्रिक कंपन — सक्रिय चुंबकीय बियरिंग्स वाली घूर्णन मशीनरी का कंपन — भाग 3 स्थिरता मार्जिन का मूल्यांकन |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 17.160 |
Date of Project Approval : | 22-02-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Transmission equipments and bearings |
Sub Sub Group : | Bearings and its components, (Types & Rating) |
Aspects : | Methods of tests |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 14839-3:2006 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This standard establishes the stability requirements of rotating machinery equipped with active magnetic bearings (AMB). It specifies a particular index to evaluate the stability margin and delineates the measurement of this index. It is applicable to industrial rotating machines operating at nominal power greater than 15 kW, and not limited by size or operational rated speed. It covers both rigid AMB rotors and flexible AMB rotors. Small-scale rotors, such as turbo molecular pumps, spindles, etc., are not addressed. This standard concerns the system stability measured during normal steady-state operation in-house and/or on-site. The in-house evaluation is an absolute requirement for shipping of the equipment, while the execution of on-site evaluation depends upon mutual agreement between the purchaser and vendor. This standard does not address resonance vibration appearing when passing critical speeds. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-02-2024 | ------- | ||
2 | P-Draft Waived | 22-02-2024 | ------- | ||
3 | WC Draft | 22-02-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 28-02-2024 | WC approved by HOD |
PGDC | ------- |