Document Details
Name of Department/Committee : PGD 13
Document Number : PGD 13 ( 24941)
Document Title [English] : Mechanical Vibration Vibration of Rotating Machinery Equipped with Active Magnetic Bearings Part 4 Technical Guidelines
Document Title [Hindi] : यांत्रिक कंपन — सक्रिय चुंबकीय बियरिंग्स वाली घूर्णन मशीनरी का कंपन — भाग 4 तकनीकी दिशानिर्देश
Document Type : New
Language : English
Priority : 3
ICS Code : 17.160
Date of Project Approval : 22-02-2024
Standards to be Superseded :


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Transmission equipments and bearings
Sub Sub Group : Bearings and its components, (Types & Rating)
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department of Industrial Policy and Promotion
  • Ministry of Heavy Industries and Public Enterprises
  • Ministry of Road Transport and Highways
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 14839-4:2012
Organization Type: ISO

Sl.No. Synosis Points
1 This standard indicates a typical architecture of an active magnetic bearing (AMB) system so that users can understand which components are likely to comprise such systems and which functions these components provide, identifies the primary similarities and differences between AMB systems and conventional mechanical bearings, identifies the environmental factors that have significant impact on AMB system performance, identifies the operating limitations that are unique to AMB systems and defines standardized methods of assessing these limitations, identifies typical mechanisms for managing these limitations, especially rotor unbalance, provides considerations for the design and performance of touchdown bearing systems, defines a typical signal set for provision in an AMB system for proper system/process interface as well as condition and diagnostic monitoring & details current best practices for monitoring, operation and maintenance to achieve highest operational system reliability

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-02-2024 22-07-2024 07-10-2024 22-02-2025 SHRI KUNDAN GIRI 22-02-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-02-2024 -------
2 P-Draft Waived 22-02-2024 -------
3 WC Draft 22-02-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 29-02-2024 WC approved by HOD
PGDC   -------