Document Details
Name of Department/Committee : CHD 09
Document Number : CHD 09 ( 24974)
Document Title [English] : METHODS OF TEST FOR VITREOUS ENAMELWARE PART 2 TEST METHODS SECTION 12 RESISTANCE TO TORSION Second Revision
Document Title [Hindi] : कांच एनेमल माण्ड के परीक्षण की पद्तियाँ भाग 2 परीक्षण पद्तियाँ अनुभाग 12 ऐठन के प्रति प्रतिरोदिता ( दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : 97.040.60, 25.220.50
Date of Project Approval : 18-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 3972 : Part 2 : Sec 12: 1999
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 3972 : Part 2 : Sec 12: 1999


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Ceramicware and stoneware products and methods of test
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department of Industrial Policy and Promotion
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The first revision of this standard was brought out in 1999. In this revision the committee felt a need to revise the standard with a view to update the standard based on the experience of last two decades and on the currently available data.
2 This method of test covers a procedure for evaluating the relative resistance to failure under torsion, of vitreous enamelled test specimens prepared either from different enamels or from the same enamel processed under different conditions.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 27-02-2024 27-06-2024 27-07-2024 27-11-2024 Ms. BUNTY MUDI 27-02-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-12-2023 -------
2 P-Draft Waived 27-02-2024 -------
3 WC Draft 27-02-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : In the 28th sectional committee meeting of CHD 09 the committee decided to send the revised document into wide circulation for a period of 60 days
-------
4 WC Draft 05-03-2024 WC approved by HOD
CHDC   -------