Document Details
Name of Department/Committee : LITD 33
Document Number : LITD 33 ( 24127)
Document Title [English] : Wearable electronic devices and technologies Part 201 Electronic textile Section 3:Determination of electrical resistance of conductive textiles under simulated microclimate
Document Title [Hindi] : पहनने योग्य विद्युत उपकरण एवं प्रौद्योगिकियां – भाग 201: इलेक्ट्रॉनिक टेक्सटाइल – अनुभाग 2: सिमुलेटिड माइक्रोक्लाइमेट के अंतर्गत चालकीय वस्त्रों की विद्युत प्रतिरोधकता का निर्धारण।
Document Type : New
Language : English
Priority : 3
ICS Code : ICS 59.080.80
Date of Project Approval : 07-11-2023
Standards to be Superseded :


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Electronic components
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 63203-201-3: 2021
Organization Type: IEC

Sl.No. Synosis Points
1 This part of IEC 63203-201 specifies a test method for determination of the electrical resistance of conductive fabrics under simulated microclimate within clothing. The microclimate is the climate of the small air layer between the skin and clothing having a specific temperature and humidity. This test method can be applied to conductive fabrics including multilayer assemblies for use in clothing.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 16-11-2023 16-04-2024 01-07-2024 16-11-2024 MS. ALISMITA KHAG 16-11-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-11-2023 -------
2 P-Draft Waived 17-11-2023 -------
3 WC Draft 17-11-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : WC Draft attached Please provide your inputs
-------
4 WC Draft 20-11-2023 WC approved by HOD
LITDC   -------
5 WC Draft 09-02-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The committee decided to re-circulate this document for a period of one month Members are requested to provide input and comments on or before last date of comment
-------
6 WC Draft 14-02-2024 WC approved by HOD
LITDC   -------