Document Details |
|
Name of Department/Committee : | LITD 33 |
---|---|
Document Number : | LITD 33 ( 24128) |
Document Title [English] : | Wearable electronic devices and technologies Part 204 Electronic textile Section 1: Test method for assessing washing durability of E-textile products |
Document Title [Hindi] : | पहनने योग्य विद्युत उपकरण एवं प्रौद्योगिकियां – भाग 204: इलेक्ट्रॉनिक टेक्सटाइल – अनुभाग 1: ई-टेक्सटाइल उत्पादों की धुलाई स्थायित्व मूल्यांकन की परीक्षण विधि। |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 59.080.80; 59.080.01 |
Date of Project Approval : | 07-11-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Electronic components and devices |
Sub Sub Group : | Electronic components |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 63203-204-1: 2023 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This document specifies a household washing durability test method for e-textile products. This document includes testing procedures for e-textile products with electrically conductive components and sensors to collect the data of the user. This document does not cover safety or heat-generation test methods. Products containing components other than those listed in this clause are not covered by this document. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 07-11-2023 | ------- | ||
2 | P-Draft Waived | 17-11-2023 | ------- | ||
3 | WC Draft | 17-11-2023 | Duration : 60 Days Submitted for HOD approval Remarks : WC Draft attached Please provide your inputs |
------- | |
4 | WC Draft | 20-11-2023 | WC approved by HOD |
LITDC LITD 33 : P1, | ------- |
5 | WC Draft | 09-02-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The committee decided to re-circulate this document for a period of one month Members are requested to provide input and comments on or before last date of comment |
------- | |
6 | WC Draft | 14-02-2024 | WC approved by HOD |
LITDC LITD 33 : P1, | ------- |