Document Details
Name of Department/Committee : LITD 33
Document Number : LITD 33 ( 24128)
Document Title [English] : Wearable electronic devices and technologies Part 204 Electronic textile Section 1: Test method for assessing washing durability of E-textile products
Document Title [Hindi] : पहनने योग्य विद्युत उपकरण एवं प्रौद्योगिकियां – भाग 204: इलेक्ट्रॉनिक टेक्सटाइल – अनुभाग 1: ई-टेक्सटाइल उत्पादों की धुलाई स्थायित्व मूल्यांकन की परीक्षण विधि।
Document Type : New
Language : English
Priority : 3
ICS Code : 59.080.80; 59.080.01
Date of Project Approval : 07-11-2023
Standards to be Superseded :


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Electronic components
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 63203-204-1: 2023
Organization Type: IEC

Sl.No. Synosis Points
1 This document specifies a household washing durability test method for e-textile products. This document includes testing procedures for e-textile products with electrically conductive components and sensors to collect the data of the user. This document does not cover safety or heat-generation test methods. Products containing components other than those listed in this clause are not covered by this document.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 16-11-2023 16-04-2024 01-07-2024 16-11-2024 MS. ALISMITA KHAG 16-11-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-11-2023 -------
2 P-Draft Waived 17-11-2023 -------
3 WC Draft 17-11-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : WC Draft attached Please provide your inputs
-------
4 WC Draft 20-11-2023 WC approved by HOD
LITDC  LITD 33 : P1, -------
5 WC Draft 09-02-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The committee decided to re-circulate this document for a period of one month Members are requested to provide input and comments on or before last date of comment
-------
6 WC Draft 14-02-2024 WC approved by HOD
LITDC  LITD 33 : P1, -------