Document Details
Name of Department/Committee : FAD 01
Document Number : FAD 01 ( 25475)
Document Title [English] : Butachlor emulsifiable concentrate (EC) - Specification (first revision)
Document Title [Hindi] : ब्यूटाक्लॉर ईमलसीफ़ाईऐबल कान्सन्ट्रैट (ईसी) — विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 65.100.20
Date of Project Approval : 18-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9356: 1980
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 9356: 1980


Classification Details
Group : Agriculture, Agricultural Products and Implements
Sub Group : Pesticides and Insecticides
Sub Sub Group : Pesticides
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Agriculture
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Division Council Chairperson Approval Details
Request Date: 25-09-2024
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Dr. Himanshu Pathak
Attachment :  View
Sectional Committee Chairman Approval :
 View


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1070: 2023 Reagent Grade Water Specification (Fourth Revision)
2 IS 6940: 1982 Methods of test for pesticides and their formulations (First Revision)
3 IS 1448 : Part 20: 2019 Methods of test for petroleum and its products [P : 20] determination of flash point - Abel closed - Cup method (Third Revision)
4 IS 8190 : Part 2: 1988 Requirements for packing of pesticides: Part 2 liquid pesticides (Second Revision)
5 IS 10627: 1983 Methods for sampling of pesticidal formulations

Sl. No. Document No Document Title
1 FAD/01 / 25474 Butachlor, technical - Specification (first revision)

Sl.No. Synosis Points
1 This standard prescribes requirements and the methods of sampling and test for butachlor, emulsifiable concentrate (EC).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 30-04-2024 30-09-2024 15-12-2024 30-04-2025 Mr. KULDEEP 30-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-04-2024 -------
2 P-Draft Waived 01-05-2024 -------
3 WC Draft 01-05-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 01-05-2024 WC approved by HOD
FADC  FAD 01, -------
5 Skipped to Finalization 05-08-2024 Stage-Changed -------
6 Finalization 18-07-2024 ------ -------
7 Final Draft 05-08-2024 Submited for HOD approval
-------
8 Final Draft draft accepted by HOD and sent to Publication 05-08-2024 Final Draft approved by HOD -------
9 Accepted by Publication 10-08-2024 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
10 Accepted by Publication 10-08-2024 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
11 Proof sent by OSA to Publication 14-08-2024 Proof to OSA Stage-Skipped -------
12 Proof sent to Technical Department 14-08-2024 प्रथम एडिटिड कॉपी सलग्न है -------
13 Proof sent to Publication 20-08-2024 ------ -------
14 Proof sent by OSA to Publication 23-08-2024 Proof to OSA Stage-Skipped -------
15 Skipped to Pdf Stage 23-08-2024 Proof to Technial Department Stage-Skipped -------
16 Stage-Skipped 23-08-2024 PDF to OSA Stage-Skipped -------
17 Pdf sent by Publication to Technical Department 23-08-2024 नए SOP के अनुरूप Bookmarks एवं Hyperlinking का प्रयोग किया गया है । कृपया इसे चेक कर लें । डी सी चेयरपर्सन के अप्रूवल एवं गज़ेट डिटेल्स हेतु पी डी एफ फॉर्मैट संलग्न है । -------
18 Pdf sent by Technical Department to Publication 25-09-2024 Kindly proceed it for Gazette notification. -------
19 Pdf sent by Publication to Technical Department 28-09-2024 Gazette details may kindly be reviewed in line with Publication Department circular Pub/SOP/Concurrent Running dates 22 July 2024. -------
20 Pdf sent by Technical Department to Publication 30-09-2024 The Gazette details have been modified. -------
21 Pdf sent by Publication to Technical Department 04-10-2024 IS 9355 has been mentioned to be withdrawn. It may kindly be reviewed if IS 9356 should also be withdrawn after publishing this standard with 6 months concurrent running period. -------
22 Pdf sent by Technical Department to Publication 10-10-2024 The information has been updated. Kindly proceed it for Gazette Notification. -------
23 Ready for Gazette 11-10-2024 Stage-Changed -------