Document Details
Name of Department/Committee : FAD 11
Document Number : FAD 11 ( 25506)
Document Title [English] : Guards For Harvesting machines - Specification (second revision)
Document Title [Hindi] : हार्वेस्टिंग मशीनों के लिए गार्ड्स - विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 65.060.01
Date of Project Approval : 11-08-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 6024: 1983
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 6024: 1983


Classification Details
Group : Agriculture, Agricultural Products and Implements
Sub Group : Agricultural Implements and godowns
Sub Sub Group : General Agricultural Equipment
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Agriculture - Department of Agriculture and Farmer Welfare
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1030: 1998 Carbon steel castings for general engineering purposes - Specification (Fifth Revision)
2 IS 2004: 1991 Carbon steel forgings for general engineering purposes - Specification (Third Revision)
3 IS 6025: 2024 Knife Sections for Harvesting Machines — Specification (Second Revision)
4 IS 7201 : Part 1: 1987 Methods of Sampling for Agricultural Machinery and Equipment : Part 1 Hand - Tools and Hand - Operated / Animal Drawn Equipment (First Revision)
5 IS 14329: 1995 Malleable iron castings - Specification
6 IS 1500 : Part 1: 2019 Metallic materials - Brinell hardness test: Part 1 test method (Fifth Revision)
7 IS 1586 : Part 1: 2018 Metallic materials - Rockwell hardness test: Part 1 test method (Fifth Revision)

Sl.No. Synosis Points
1 Guards, also known as fingers, provided in the cutter bar of harvesting machines constitute major part of non-reciprocating mechanism.
2 This standard specifies material, dimensional and other requirements for single point and double point guards (fingers) used in harvesting machines.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 01-05-2024 01-09-2024 01-10-2024 01-02-2025 Mr. Vikrant Chauhan 01-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 11-08-2022 -------
2 P-Draft Waived 01-05-2024 The FAD 11 committee in its 22nd meeting held on 11 August 2022, approved the revised draft of IS 6024 to be sent into wide circulation. -------
3 WC Draft 01-05-2024 Duration : 62 Days
Submitted for HOD approval
Remarks : The FAD 11 committee in its 22nd meeting held on 11 August 2022 approved the revised draft of IS 6024 to be sent into wide circulation
-------
4 WC Draft 01-05-2024 WC approved by HOD
FADC  FAD 11, FAD 11 : P3, -------
5 Skipped to Finalization 27-09-2024 Stage-Changed -------
6 Finalization 02-07-2024 The FAD 11 committee in its 27th meeting finalized the draft revision of IS 6024 for publication -------
7 Final Draft 27-09-2024 Submited for HOD approval

Remarks: The FAD 11 committee in its 27th meeting held on 2 July 2024 finalized the draft revision of IS 6024 for publication
-------
8 Final Draft 27-09-2024 Final Draft approved by HOD -------
9 Final Draft draft rejected by Publication 30-09-2024 Final Draft rejected by Publication
Remarks: 1. Clear figures/images/flowcharts with lettering in capitals should be provided with F-Drafts. The request for preparation of drawings received at the Publication stage increases the overall time taken at the Gazette notification stage. 2. SOP for Publication of Indian Standards including checklists should be followed in preparation of F-Drafts (copy attached). 3. The first cover page templates for indigenous, modified, identical adoption of ISO/IEC standards have already been shared with Technical Departments, however same is not being used by Technical Departments, therefore, resulting in duplicacy of work. The templates attached herewith may kindly be used in preparation of F-Drafts. 4. Use 1 enter spacing after the line instead of 6 layout spacing. 5. Clause 2 references shifted in Annex A if references are more than 6.
-------