Document Details
Name of Department/Committee : CHD 19
Document Number : CHD 19 ( 25550)
Document Title [English] : HEEL-TIP AND TOE-TIP WITH NAILS FOR FOOTWEAR SPECIFICATION ( First Revision )
Document Title [Hindi] : जूते के लिए कील के साथ हील - टिप और टो - टिप— विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 61.060
Date of Project Approval : 13-02-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 8060: 1976
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 8060: 1976


Classification Details
Group : Leather and Leather Products
Sub Group : Footwear and Accessories (including PVC footwear)
Sub Sub Group : Tools, equipment and accessories in footwear industry
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1573: 1986 Specification for electroplated coatings of zinc on iron and steel (Second Revision)
2 IS 2050: 1991 Glossary of terms relating to footwear (First Revision)
3 IS 2633: 1986 Method for testing uniformity of coating on zinc coated articles (Second Revision)
4 IS 4905: 2015 Random sampling and randomization procedures (First Revision)

Sl.No. Synosis Points
1 i )Heel-tips and toe-tips are important footwear accessories. They are used in industrial and safety leather boots and other types of ankle boots for heavy duty and general purposes. ii) This standard prescribes the requirements and method of sampling for heel-tip and toe-tip with nails intended for use in footwear.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 03-05-2024 03-10-2024 18-12-2024 03-05-2025 MS. PREETI PRABHA 03-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-02-2024 -------
2 P-Draft Waived 06-05-2024 -------
3 WC Draft 06-05-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The committee during the 43rd meeting of CHD 19 decided to send the document into WC for 60 days
-------
4 WC Draft 06-05-2024 WC approved by HOD
CHDC   -------
5 Skipped to Finalization 28-10-2024 Stage-Changed -------
6 Finalization 11-09-2024 The Committee finalized the document for printing during 45th meeting of CHD19 held on 11th September 2024 -------
7 Final Draft 28-10-2024 Submited for HOD approval
-------
8 Final Draft Rejected by HOD 28-10-2024 Final Draft rejected by HOD
Remarks: Please review the Hindi title.
-------
9 Final Draft 30-10-2024 Submited for HOD approval
-------
10 Final Draft Rejected by HOD 04-11-2024 Final Draft rejected by HOD
Remarks: Please review the title.
-------
11 Final Draft 04-11-2024 Submited for HOD approval
-------
12 Final Draft draft accepted by HOD and sent to Publication 04-11-2024 Final Draft approved by HOD -------
13 Final Draft 04-11-2024 Final Draft rejected by Publication
Remarks: Kindly change MS word formatting while preparing the document. It is showing tree structure of Headings and their text. Using this formatting, data goes behind its arrow. It is requested, Kindly create document in normal format. Documents sent with these triangle marks are not editable/misaligned/text lost. Please resend the document in word under normal heading.
-------
14 Final Draft 07-11-2024 Submited for HOD approval
-------
15 Final Draft draft accepted by HOD and sent to Publication 16-11-2024 Final Draft approved by HOD -------
16 Accepted by Publication 21-11-2024 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
17 Proof sent by OSA to Publication 25-11-2024 Proof to OSA Stage-Skipped -------
18 Proof sent to Technical Department 25-11-2024 प्रथम एडिटिड कॉपी संलग्नहै । -------
19 Proof sent to Publication 05-12-2024 Corrected Proof attached. -------
20 Skipped to Pdf Stage 05-12-2024 Proof to Technial Department Stage-Skipped -------
21 Stage-Skipped 05-12-2024 PDF to OSA Stage-Skipped -------
22 Pdf sent by Publication to Technical Department 05-12-2024 Kindly check the attached PDF document and revert along with DC Chairperson approval and Gazette details. -------