Document Details
Name of Department/Committee : CED 44
Document Number : CED 44 ( 25070)
Document Title [English] : Method of Measurement of Building and Civil Engineering Works : Part 27 Earth Work done by Mechanical Appliances
Document Title [Hindi] : भवन निर्माण और सिविल इंजीनियरिंग कार्यों की मापन पद्धतियाँ भाग 27 यांत्रिक उपकरणों द्वारा किया गया भूमि कार्य
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 17.020; 91.040.01; 93.010
Date of Project Approval : 05-02-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1200 : Part 27: 2013
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1200 : Part 27: 2013


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : Methods of Measurement of building and civil engineering works and Handbook
Aspects : Others
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Poverty Alleviation
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The procedure for measurement of linear dimensions in excavation activity has been modified.
2 Theodolite and total station have been included in the list of equipment to be used for levelling
3 The girth of vegetation has been specified
4 The names of rocks classified as hard rocks have been mentioned.
5 The provision for excavating hard rocks wherever blasting may not be feasible has been incorporated.
6 The provision for measurement of excavated materials in tunnels have also been included
7 Consideration of working space while excavating has been included.
8 Excavation in different combinations of soil and rock have been considered.
9 Provision for carriage by manual labour and by animal/mechanical transport have been incorporated

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 15-03-2024 15-08-2024 30-10-2024 17-03-2025 DIVYA S 15-03-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 05-02-2024 -------
2 P-Draft Waived 15-03-2024 -------
3 WC Draft 15-03-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Submitted for HOD Approval
-------
4 WC Draft 17-03-2024 WC approved by HOD
CEDC   -------