Document Details |
|||||
Name of Department/Committee : | FAD 11 | ||||
---|---|---|---|---|---|
Document Number : | FAD 11 ( 25122) | ||||
Document Title [English] : | Manually operated fertilizer boradcaster - Specification first revision of IS 12337 | ||||
Document Title [Hindi] : | मैन्युअल रूप से संचालित उर्वरक प्रसारणकर्ता - विशिष्टता (आइ एस 12337 का पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 65.060.10 | ||||
Date of Project Approval : | 28-02-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Agricultural Implements and godowns |
Sub Sub Group : | Pre and Post Harvest Equipment equipment |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Fertilizers are broadcasted in the field mostly by hand. But hand broadcasting is a time-consuming operation and also the distribution is not uniform. To overcome this issue, simple hand-operated fertilizer broadcasters were developed. As demand of these broadcasters increased among the farmers, a need was felt to develop a standard for the manufacturers to produce and users to select good quality fertilizer broadcasters. | |
2 | This standard prescribes the material, constructional and other requirements of manually operated fertilizer broadcaster. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-02-2024 | ------- | ||
2 | P-Draft Waived | 27-03-2024 | The FAD 11 committee in its 26th meeting held on 28 February 2024, decided to send the draft revision of IS 12337 into wide circulation for a period of 60 days. | ------- | |
3 | WC Draft | 27-03-2024 | Duration : 62 Days Submitted for HOD approval Remarks : The FAD 11 committee in its 26th meeting held on 28 February 2024 decided to send the draft revision of IS 12337 into wide circulation for a period of 60 days |
------- | |
4 | WC Draft | 27-03-2024 | WC approved by HOD |
FADC FAD 11, FAD 11 : P3, | ------- |