Document Details
Name of Department/Committee : TXD 30
Document Number : TXD 30 ( 25136)
Document Title [English] : Geotextiles - Methods of Test Part 2 Determination of Resistance to the Exposure of Ultraviolet Light Moisture and Heat Xenon-Arc Type Apparatus
Document Title [Hindi] : भूवस्त्रादि — परीक्षण की पद्धतियाँ भाग 2 परा बैंगनी प्रकाश, नमी और ऊष्मा में जीनान आर्क प्रकार के उपकरण द्वारा अनावरण का प्रतिरोध ज्ञात करना
Document Type : Revision
Language : English
Priority : 3
ICS Code : 59.080.70
Date of Project Approval : 28-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13162 : Part 2: 1991
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13162 : Part 2: 1991


Classification Details
Group : Textile, Textile Products and Machinery
Sub Group : Textile for special use
Sub Sub Group : Geo-synthetics
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Textiles
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard was first published in 1991. The present revision has been made in the light of experience gained since last revision and to incorporate the following major changes: 1) Title of the standard has been modified; 2) Scope of the standard has been modified to include the word ‘heat’; 3) References to Indian Standard given in Annex A has been updated; 4) The exposure cycle given in the standard has been changed from ‘102 minutes of light exposure and 18 minutes of water, spray and light exposure’ to ’90 minutes of light and 30 minutes of light plus water spray exposure’ to align the standard with the current practices; 5) Procedure of the test has been modified to specify the level of irradiance of UV light; 6) Specimen selection template has been provided for the guidance; and 7) Calculation and reporting of test result and have been modified.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 31-03-2024 31-08-2024 15-11-2024 30-03-2025 Mr. Himanshu Shukla 31-03-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-12-2023 -------
2 P-Draft Waived 31-03-2024 -------
3 WC Draft 31-03-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 31-03-2024 WC approved by HOD
TXDC  TXD 30, -------