Document Details
Name of Department/Committee : TXD 30
Document Number : TXD 30 ( 25138)
Document Title [English] : Geosynthetics - Method for Determination of Apparent Opening Size by Dry Sieving Technique
Document Title [Hindi] : भूकृत्रिम — ड्राई सिविंग तकनीक द्वारा प्रतीत छिद्र आकार निर्धारण करने की पद्धति
Document Type : Revision
Language : English
Priority : 3
ICS Code : 59.080.70
Date of Project Approval : 28-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14294: 1995
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14294: 1995


Classification Details
Group : Textile, Textile Products and Machinery
Sub Group : Textile for special use
Sub Sub Group : Geo-synthetics
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Textiles
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard was first published in 1995. The present revision has been made in the light of experience gained since last revision and to incorporate the following major changes: 1) Title of the standard has been modified; 2) References to Indian Standard given in Annex A has been updated; 3) Amendment No. 1 has been incorporated in the standard; 4) Requirement for mechanical shaker has been modified; 5) Requirement for flexible rubber template used for tracing a line on the geotextile sample has been given; 6) Procedure for preparation of test specimen has been modified; and 7) Detailed method of AOS calculation by means of plotting ‘percentage passing’ versus ‘bead/particle size’ has been specified.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 31-03-2024 31-08-2024 15-11-2024 30-03-2025 Mr. Himanshu Shukla 31-03-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-12-2023 -------
2 P-Draft Waived 31-03-2024 -------
3 WC Draft 31-03-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 31-03-2024 WC approved by HOD
TXDC   -------