Document Details |
|
Name of Department/Committee : | CHD 20 |
---|---|
Document Number : | CHD 20 ( 25149) |
Document Title [English] : | POLYMER COATED INNER TANKS FOR STORAGE WATER HEATER SPECIFICATION |
Document Title [Hindi] : | पानी संग्रहण हीटर के लिए पॉलिमर लेपित भीतरी टंकियाँ - विशिष्टि |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | ICS 87.040 |
Date of Project Approval : | 10-10-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Building Materials including Paints |
Sub Group : | Pigments, Paints and Accessories |
Sub Sub Group : | Industrial paints and related products |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The specifications for stationary storage type electric water heaters are outlined in the Indian Standard IS 2082 : 2018 "Stationary storage type electric water heaters — Specification." Currently, that standard covers water heaters with inner tanks constructed from materials such as copper, stainless steel, and vitreous enamelled coated tanks. However, due to the growing demand for water heaters with polymer-coated inner tanks in the market, the committee has decided to develop a new Indian Standard to address this product. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 10-10-2023 | ------- | ||
2 | P-Draft Waived | 01-04-2024 | The feedback of the Committee on P-darft has been taken through email sent on 19 December 2023. The comments received on P-draft have been resolved in the concerned panel. | ------- | |
3 | WC Draft | 01-04-2024 | Duration : 31 Days Submitted for HOD approval Remarks : The Committee in its 28th Meeting held on 7 March 2024 has decided to send revised draft for public comments after it had been prepared by the concerned panel Accordingly the revised draft has been prepared by the panel In light of the urgengy of the subject the Chaiperson has granted his consent to reduce the duration of the WC from two months to one month |
------- | |
4 | WC Draft | 01-04-2024 | WC approved by HOD |
CHDC ETD 32, CHD 21, | ------- |