Document Details |
|||||
Name of Department/Committee : | FAD 07 | ||||
---|---|---|---|---|---|
Document Number : | FAD 07 ( 25180) | ||||
Document Title [English] : | Triple superphosphate, fertilizer grade - Specification (Second Revision) | ||||
Document Title [Hindi] : | ट्रिपल सुपरफास्फेट, उर्वरक ग्रेड — विशिष्टि (दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 65.080 | ||||
Date of Project Approval : | 06-03-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Fertilizers including biofertilizers |
Sub Sub Group : | Chemical fertilizers |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 1070: 2023 | Reagent Grade Water Specification (Fourth Revision) | |
2 | IS 6092 : Part 1: 1985 | Methods of sampling and test for fertilizers: Part 1 sampling (First Revision) | |
3 | IS 6092 : Part 3 : Sec 2: 2004 | Methods of sampling and test for fertilizers: Part 3 determination of phosphorus: Sec 2 test methods not covered under dual number standards (Second Revision) | |
4 | IS 6092 : Part 6: 1985 | Methods of sampling and test for fertilizers: Part 6 determination of moisture and impurities (First Revision) |
Sl.No. | Synosis Points | |
1 | This standard prescribes the requirements and the methods of sampling and test for triple superphosphate for use as a fertilizer. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 06-03-2024 | ------- | ||
2 | P-Draft | 05-04-2024 | Covering letter generated | ------- | |
3 | P-Draft | 05-04-2024 | Duration : 21 Days | FAD 7, | ------- |
4 | Skipped to W-Draft | 07-06-2024 | Stage-Changed | ------- | |
5 | WC Draft | 07-06-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 07-06-2024 | WC approved by HOD |
FADC FAD 07, | ------- |
7 | Skipped to Finalization | 25-10-2024 | Stage-Changed | ------- | |
8 | Finalization | 15-10-2024 | ------ | ------- | |
9 | Final Draft | 25-10-2024 | Submited for HOD approval Remarks: In 23rd meeting of FAD 07 held on 15 October 2024 the committee finalized the document for publication |
------- | |
10 | Final Draft draft accepted by HOD and sent to Publication | 25-10-2024 | Final Draft approved by HOD | ------- | |
11 | Final Draft | 06-11-2024 | Final Draft rejected by Publication Remarks: English and Hindi title mismatch in document details mentioned on portal and that in F draft. 2 Kindly arrange Terminology in alphabetical order. 3 Kindly arrange Committee composition in alphabetical order also provide city name instead of state name. |
------- | |
12 | Final Draft | 06-11-2024 | Final Draft rejected by Publication Remarks: English and Hindi title mismatch in document details mentioned on portal and that in F draft. 2 Kindly arrange Terminology in alphabetical order. 3 Kindly arrange Committee composition in alphabetical order also provide city name instead of state name. |
------- | |
13 | Final Draft | 30-12-2024 | Submited for HOD approval Remarks: The details have been updated |
------- | |
14 | Final Draft Rejected by HOD | 30-12-2024 | Final Draft rejected by HOD Remarks: 1. Give title above scope. 2. In committee composition provide city name instead of state name. |
------- | |
15 | Final Draft | 30-12-2024 | Submited for HOD approval Remarks: The correction has been incorporated |
------- | |
16 | Final Draft Rejected by HOD | 30-12-2024 | Final Draft rejected by HOD Remarks: yes |
------- | |
17 | Final Draft | 30-12-2024 | Submited for HOD approval Remarks: The correction has been incorporated |
------- | |
18 | Final Draft draft accepted by HOD and sent to Publication | 30-12-2024 | Final Draft approved by HOD | ------- | |
19 | Accepted by Publication | 06-01-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
20 | Proof sent to Technical Department | 16-01-2025 | प्रथम एडिटिड कॉपी संलग्न है | ------- | |
21 | Proof sent to Publication | 17-01-2025 | Kindly process it further | ------- | |
22 | Skipped to Pdf Stage | 27-01-2025 | Proof to Technial Department Stage-Skipped | ------- | |
23 | Pdf sent by Publication to Technical Department | 27-01-2025 | PDF Attached, Kindly check and revert along with DC approval and a comment have been added kindly check and reply the comment. | ------- | |
24 | Pdf sent by Technical Department to Publication | 27-01-2025 | Dr. S. K. Behera is an Alternate Member. Kindly make the suitable change as required in the document and send back for DC Chairperson approval. | ------- | |
25 | Pdf sent by Publication to Technical Department | 28-01-2025 | Correction have been done as per your comment Kindly check the final PDF and confirm the correctness of the document, and also provide the DC Chairperson approval and gazette details. | ------- |