Document Details
Name of Department/Committee : CHD 34
Document Number : CHD 34 ( 25252)
Document Title [English] : CARBON DIOXIDE CAPTURE, TRANSPORTATION, AND GEOLOGICAL STORAGE - INJECTION OPERATIONS, INFRASTRUCTURE, AND MONITORING
Document Title [Hindi] : कार्बन डाइऑक्साइड कैप्चर, परिवहन और भूवैज्ञानिक भंडारण - इंजेक्शन संचालन बुनियादी ढांचा और निगरानी
Document Type : New
Language : English
Priority : 2
ICS Code : 13.020.40
Date of Project Approval : 12-04-2024
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Environmental Management
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title : INJECTION OPERATIONS INFRASTRUCTURE AND MONITORING
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
  • CLIMATE ACTION
  • LIFE ON LAND
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO/TR 27923:2022
Organization Type: ISO

Sl.No. Synosis Points
1 This standard specific the information about CO2 injection facilities based on existing and planned projects that include storage of CO2 in both saline aquifers and CO2-EOR as relevant. This information includes aspects of materials used, surface infrastructure, well design considerations, concepts around well placement strategies, considerations for downhole monitoring tool deployment, well completions, and well and infrastructure maintenance and remediation practices.
2 This standard also provides the descriptions of current practices regarding operating projects including monitoring, safety, and reporting activities associated with both surface and downhole components of the projects. A description of existing and emerging tools, accuracy, and expectations for quantification.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-04-2024 12-08-2024 12-09-2024 12-01-2025 Mr. Mohit Garg 12-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-04-2024 -------
2 P-Draft Waived 15-04-2024 The Draft National Foreword is approved for the wide circulation in the 31st meeting of CHD 34 -------
3 WC Draft 19-04-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 19-04-2024 WC approved by HOD
CHDC  CHD 34, CHD 34 : 3, -------