Document Details
Name of Department/Committee : CHD 34
Document Number : CHD 34 ( 25266)
Document Title [English] : CIRCULAR ECONOMY - MEASURING AND ASSESSING CIRCULARITY PERFORMANCE
Document Title [Hindi] : सर्कुलर इकोनॉमी - सर्कुलरिटी प्रदर्शन को मापना और उसका आकलन करना
Document Type : New
Language : English
Priority : 2
ICS Code : 03.100.01,13.020.20
Date of Project Approval : 12-04-2024
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Environmental Management
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title : MEASURING AND ASSESSING CIRCULARITY PERFORMANCE
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
  • CLIMATE ACTION
  • LIFE ON LAND
  • LIFE BELOW WATER
  • RESPOSIBLE CONSUMPTION AND PRODUCTION
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 59020: 2024
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies requirements and gives guidance to organizations for measuring and assessing a defined economic system to determine their circularity performance at a specific time. Measurement and assessment are performed by the collection and calculation of data with the help of mandatory and optional circularity indicators.
2 This document provides a framework to guide users within organizations of all types and sizes through the measurement and assessment process, including system boundary setting and choice of indicators, as well as processing and interpreting data in a consistent and reproducible manner to generate meaningful and verifiable results.
3 The framework is applicable to multiple levels of an economic system ranging from regional, inter-organizational, and organizational to the product level.
4 To measure and assess social, environmental and economic impacts that are caused by the actions of the organization to achieve circular goals and objectives, the document provides a list of complementary methods that can be used in addition to this document.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-04-2024 12-08-2024 12-09-2024 12-01-2025 Mr. Mohit Garg 12-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-04-2024 -------
2 P-Draft Waived 18-04-2024 The Draft National Foreword is approved for wide circulation in the 31st meeting of CHD 34 -------
3 WC Draft 19-04-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 19-04-2024 WC approved by HOD
CHDC  CHD 34 : P14, CHD 34 : 4, -------